The Helix Bridge is an engineering feat assembled with great precision. Its curved design is created by two opposing spiral steel members, held together by a series of connecting struts, symbolising “life and continuity”, “renewal”, “everlasting abundance” and “growth”, and resembles the structure of DNA.
The Helix Bridge is an engineering feat assembled with great precision. Its curved design is created by two opposing spiral steel members, held together by a series of connecting struts, symbolising “life and continuity”, “renewal”, “everlasting abundance” and “growth”, and resembles the structure of DNA.
The entire bridge was opened on 18 July 2010 to complete the entire walkway around Marina Bay, Singapore.
The Helix is fabricated from approximately 650 tonnes of Duplex Stainless Steel and 1000 tonnes of carbon steel used in the temporary structure and also helping the bridge to get the helix shape.
The entire bridge was opened on 18 July 2010 to complete the entire walkway around Marina Bay, Singapore.